About the Author...  |
|
Kathleen Booth is a PPP expert who advises governments on structuring and
implementing public-private partnerships. Ms. Booth has worked across a range
of sectors, including water and sanitation, solid waste, energy,
transportation, telecommunications, environment, agriculture, health, and
education. Globally, she has provided PPP services in Kenya, The Bahamas,
Brazil, Bulgaria, Canada, Croatia, Egypt, El Salvador, Germany, Ghana,
Guatemala, Guyana, Honduras, India, Jamaica, Kenya, Mexico, Mozambique, Nepal,
Panama, Peru, the Philippines, Romania, Thailand, and Turkey. |
|
New Approaches to PPP in the Roads
Sector: India's Annuity Concessions
Kathleen L. S. Booth
|
Abstract |
India has pioneered a new model for
PPP in the roads sector that holds the potential for application in other areas
such as water and solid waste. In this case study, author Kathleen Booth
describes how India has leveraged this new PPP model to attract private finance
where classic project finance structures were too risky.
Introduction
India has pioneered a new model for
PPP in the roads sector that holds the potential for application in other areas
such as water and solid waste. This model, called "annuity concessions," was
developed by the National Highways Authority of India (NHAI) under the National
Highways Development Program (NHDP). |
NHAI was formed under the Ministry of
Shipping, Road Transport and Highways (MSRTH) in 1988 as a result of the
National Highways Authority of India Act, and became operational in 1995, when
a fulltime Chairperson and five full time Members were appointed. It is
responsible for the development, maintenance and management of national
highways, primarily through the NHDP.¹
National highways are critical to India's
economy and development. Although they constitute only 2% of the total road
length in the country, they carry more than 40% of total road traffic².
Demand is steadily growing, and the number of vehicles in India has increased
by 10.16% per year over the last five years. Work under the NHDP is aimed at
developing international quality roads and improved traffic flow through:
- Rehabilitating and widening (to four lanes) of roads;
- Enhanced safety features;
- Improvements to road surfacing;
- Better traffic management and signage;
- Divided carriageways and service roads;
- Grade separators;
- Over- and underpasses;
- Bypasses; and
- Wayside amenities.
The objective of these programs is to spur
economic growth and productivity through reductions in vehicle operating costs,
travel time, fuel consumption, accidents, and road maintenance costs, as well
as enhanced economic activity by facilitating trade and transport, particularly
of perishable materials.
The NHDP has to date included three phases
- NHDP I, II, and III - which have received funding and support from a variety
of international financial institutions including the World Bank, the Asian
Development Bank, the Japan Bank for International Cooperation (JBIC) and
others. A number of projects have been completed under the NHDP, including the
rehabilitation and widening of the Golden Quadrilateral corridor (over 5,000
kilometers of highway network connecting Dehli, Kolkata, Chennai, and Mumbai),
Figure 1: Map of NHDP
Projects

the North-South and East-West corridors
(7,300 kilometers connecting Kashmir to Kanyakumari and Silchar to Porbandhar),
as well as 361 kilometers of port connectivity projects and 779 kilometers of
other national highways (see Figure 1 above).
Funding for these projects comes from a
combination of sources: cess (a dedicated assessment on gas and diesel), donor
agency support, commercial loans, and the private sector through public-private
partnerships. (see Table 1 below)
Table 1: Source of Funds
for NHDP Projects³
| Source of Funds |
Amount (US Dollar) |
| Cess |
4.3 billion |
| World Bank/Asian Development Bank |
4.3 billion |
| Commercial loans |
2.6 billion |
| Private Sector |
1.3 billion |
| TOTAL |
US$ 12.5 billion |
The money raised by cess goes directly into
a Central Road Fund (CRF) that is used exclusively to fund road improvement
projects carried out by NHAI as well as other agencies including State
Governments. Transfers from the CRF have helped NHAI not only to fund projects
under NHDP, but have helped to leverage other sources of finance by serving as
security for commercial borrowing.
Public Private
Partnerships
Transport sector spending as a share of
total public investment in India has been declining steadily over the years and
as a result, there is a severe shortage of public funds available for road
construction and maintenance. Private financing for road improvements thus
constitutes a critical element of NHAI's strategy for funding projects under
the NHDP, and the Government of India has introduced a number of policy
initiatives aimed at bolstering the level of international as well as domestic
private sector participation in the construction and maintenance of roads
projects. These include:
- Inclusion of PSP in the transport sector as a specific
goal in the Government's Tenth Plan4
- An amendment to the National Highways Act of 1965 to
allow Build-Operate-Transfer (BOT) projects and the collection of tolls by
private operators on both public and private roads;
- The development of standardized formats for PPP
contracts in the roads sector;
- Simplification of the procedures required to acquire
land for roads projects and to receive environmental permits;
- Passage of the 2002 Securitization Act, which allows
banks or financial institutions that are secured creditors under a non-recourse
or limited recourse arrangement with a borrower to enforce a secured interest
created in its favor without the intervention of any court or tribunal;
and
- Passage of the 1996 Arbitration and Conciliation Act,
which allows dispute resolution under United Nations Commission on
International Trade Law (UNCITRAL) rules.
In addition, the Government introduced a
specific policy for PPP in the roads sector. The main features of that policy
include:
- Foreign direct investment of up to 100% is allowed;
- NHAI can participate with up to 30% of the total equity
of a Special Purpose Vehicle (SPV) established to develop a road project;
- NHAI can provide capital grants to road project
developers on a case by case basis;
- Traffic support/guarantees are provided on a case by
case basis;
- Real estate development can be made an integral part of
BOT projects to enhance their financial viability;
- Private investors are to be protected against force
majeure situations including political, non-political and legislative
changes;
- Dispute resolution will be governed by the 1996 Indian
Arbitration and Conciliation Act, which incorporates UNCITRAL provisions;
and
- The ownership of land for highway construction and
roadside facilities will vest in Government and mortgaging of such land is not
allowed, however land can be leased to private operators under a
PPP5.
As a result of these and other policy
initiatives, a range of PPP modalities have been employed to fund approximately
20% of the roads projects under NHDP, including traditional models such as BOT
arrangements and joint ventures, and a new and innovative form of PPP, referred
to as an "Annuity Concession."
For high density corridors where the
potential for direct tolling of road users exists, the Government of India has
successfully utilized BOT toll road concessions as a way of mobilizing private
financing. Under this model, the private sector builds, operates, and maintains
the road for the period of the contract (usually up to 30 years), after which
the road is transferred back to Government. The private operator is remunerated
through the collection of tolls charged for use of the road, and in some cases,
in part by payment directly from Government. Today, approximately 500 km of
national highways are privately managed as toll roads, raising around 10.5
billion rupees per year (US$ 224 million)6.
The joint venture model of PPP has been
used primarily for port connectivity projects, the least risky of the NHDP
programs. Under this model, the Government and the private sector join forces
in establishing a Special Purpose Vehicle (SPV) for financing and implementing
the PPP project. Because user entities generally can contribute to part of
project financing, these projects have been able to achieve investment-grade
ratings from at least one credit rating agency and thereby attract long-term
financing from such risk averse sources as insurance companies, pension funds,
and other institutional investors.
Annuity Concessions
Where revenues from tolling are uncertain
or will be insufficient to attract BOT operators, the Government traditionally
had to employ Engineering, Procurement and Construction (EPC) contracts which
entail little to no risk on the part of the private sector. To fill this gap,
NHAI has developed the Annuity Concession model. To date, approximately 8% of
the length of roadways subject to NHDP funding has been commissioned using the
Annuity Concession model7.
Annuity Concessions are a variant of the
BOT model in which the private operator is remunerated via a fixed, periodical
payment ("annuity") from NHAI rather than through toll proceeds. Under these
contracts, the private operator is responsible both for constructing the road,
as well as for operating and maintaining it for a fixed period of time
(typically ten years). Because the break-even point for the private operator
does not occur until late in the contract (typically around the seventh year in
a ten year contract), this form of PPP transfers both responsibility for bridge
financing and performance risk to the private sector. In addition, because the
annuity payments are not indexed, the private sector retains any risks
associated with higher than anticipated operations and maintenance (O&M)
costs.
Although Annuity Concessions do transfer
certain key risks to the private sector, they keep revenue risk with Government
(which retains the right to set and collect tolls). This makes Annuity
Concessions attractive to private operators where a BOT-type arrangement would
be considered too risky (see Figure 2, below).
Figure 2: Risk Profile of
NHAI PPP Arrangements

Because these projects are seen by the
financial community as having a secure and stable source of funding (the
annuity payments, which are financed by cess), many of them have been funded
with debt-equity ratios of up to 75:25 (whereas the typical toll-based projects
have debt-equity ratios of 70:30. Generally, there is no requirement for debt
servicing the construction period, and repayment begins after project
commissioning (see Figure 3, below).
Figure 3: Structure of
Annuity Concessions Source: The World Bank8

As of 2003, NHAI had awarded annuity
concessions totaling 28.8 billion rupees (approximately US$ 618 million). (see
Table 2 below)
Table 2: Annuity
Concessions Awarded to Date9
| Road |
Annuity Amount (Rs. Millions) |
| Golden Quadrilateral |
|
| Panagarh - Palsit |
5,550 |
| Palsit - Dankuni (Durgapur Expressway) |
3,998 |
| Makarastra Border - Balgaum |
5,050 |
| Ankapalli - Tuni |
2,948 |
| Tuni - Dharmavaram |
2,791 |
| Dharmavaram - Rajamundry |
2,962 |
| Nellore Bypass |
1,296 |
| Other Projects |
|
| Tambaram - Tindivanam |
4,186 |
| TOTAL |
28,781 |
NHAI procures Annuity Concessions using a
competitive bidding process (including prequalification based on bidders'
experience and financial capability) that awards the contract to the bidder
offering to perform the work for the lowest annuity payments from NHAI.
Although selection is primarily based on the financial bid, technical proposals
must comply with predefined design, construction, O&M and hand-back
requirements.
Unlike typical construction contracts,
Annuity Concessions do not require any advance payment to the private operator.
Instead, NHAI does not begin paying the annuity until the road is constructed
in accordance with the quality standards set out in the contract. This model
rewards early completion and provides the private operator with a built-in
incentive to ensure that the road is constructed in a way that minimizes long
term O&M costs while meeting quality standards. This focus on performance
has reduced the amount (and cost) of monitoring and oversight required of
Government during the construction period. It has also resulted in construction
costs that are on average 12 to 35% lower than NHAI's estimates.
The Annuity Concession model of PPP has
proven popular with private investors in India, and is now the most widely
employed form of PPP in terms of length of roadways. The model has been
particularly successful at attracting domestic private investors, with all but
a few of the contracts underway being implemented by Indian companies.
The model is also favored by the Indian
Government, which has seen a number of advantages to Annuity Concessions,
including:
- Transfer of initial financing, construction, O&M,
and project completion risks to the private sector;
- Construction completed much faster and less expensively
than under traditional EPC contracts;
- The annuity payment structure allows a firm calculation
of NHAI's financial exposure under the contract;
- The fixed nature of the annuity payments significantly
reduces the risk of contract renegotiation with the private sector; and
- Substantial growth of domestic private sector capacity
(not just in construction, but in operations and maintenance as well) in the
roads sector.
Based on its successful experience with the
Annuity Concession model in the roads sector, the Government (national as well
as some state governments) of India has now begun testing the model in other
sectors such as water and solid waste.
Conclusion
Through the application of a variety of PPP
models, the NHAI has succeeded in mobilizing private financing for the roads
sector in India. As a supplement to the more traditional PPP models such as
BOTs and joint ventures, the Annuity Concession has proven an effective way to
attract private finance where classic project finance structures would be
considered too risky. While this model keeps revenue risk with Government, it
does transfer other risks - including initial financing, construction, O&M
and project completion risk - to the private sector. And its focus on outputs,
or performance by the private operator, has reduced the cost and administrative
burden to Government for monitoring private contractors.
Given its successful use in the roads
sector in India, the Annuity Concession model of PPP holds the potential to
attract private finance in other sectors - such as water and solid waste -
which often do not generate sufficient revenues to support BOT or concession
type models. And the experience in India can provide valuable lessons to
Governments around the world looking for a PPP solution that leverages private
finance without necessitating dramatic increases in tariffs or user fees.
¹ National
Highways Authority of India (http://www.nhai.org/), accessed July 23,
2006. ² National Highways Authority of India (http://www.nhai.org/balancelength.htm),
accessed July 23, 2006. . ³National Highways Authority of India
(http://www.nhai.org/fundrequirement.htm),
accessed July 23, 20064Para 8.3.18 of Draft 10th FYP,
Planning Commission 5The World Bank, "Highway Sector
Financing in India" (http://www.highwayfinindia.org/psp_indian_enabling2.htm)
accessed July 23, 2006. 6World Bank estimates (see
http://www.highwayfinindia.org/psp_indian_rationale.htm) 7The
World Bank, "Highway Sector Financing in India" (http://www.highwayfinindia.org/psp_indian_national.htm#2)
accessed July 23, 2006. 8See The World Bank, "Highway
Sector Financing in India" (http://www.highwayfinindia.org/psp_indian_financial.htm)
accessed July 23, 2006. 9Financial Engineering Techniques
Assessment and Options Report", CES and Ernst and Young, October 2003 (Accessed
on July 23, 2006 via The World Bank, "Highway Sector Financing in India"
http://www.highwayfinindia.org/psp_indian_national2.htm)
Copyright 2006© Institute for
Public-Private Partnerships, Inc. All rights reserved
Home |
About IP3 |
Training |
Consulting
Alumni
Corner | e-Newsletter | Careers |
Site Index |
Links |
Contact
|